- SAP PP - Home
- SAP PP - Introduction
- SAP PP - Common Tables
- SAP PP - Organization Structure
- Integration with Other Modules
- SAP PP - Master Data
- SAP PP - Bill of Materials
- SAP PP - Work Center
- SAP PP - Routing
- SAP PP - Demand Management
- SAP PP - Creating PIR
- Material Requirement Planning
- SAP PP - MRP List
- SAP PP - Long Term Planning
- SAP PP - Production Orders
- SAP PP - Production Order Change
- Production Order Confirmation
- Canceling Production Order
- SAP PP - Capacity Planning
- SAP PP - Capacity Leveling
- SAP PP - Goods Receipt
- SAP PP - Stock Overview
- SAP PP - Goods Issue
- SAP PP - Goods Issue Reversal
- SAP PP - Lean Manufacturing
- SAP PP - Reports
- SAP PP - Material Document List
- Stock of Multiple Materials
- List in Bill of Material
SAP PP Online Quiz
Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Q 1 - Which of the following Transaction code can be used to check PP tables in SAP ECC system?
Answer : A
Q 2 - When you create a Material BOM without a Plant is known as?
Answer : C
Q 3 - You can use Work center to monitor which of the following activities?
Answer : D
Q 4 - For Make to Order process, which of the following Planning strategy is used?
Answer : A
Explanation
You use Planning strategy 20 for make to order MTO process and planning strategy 25 is used to produce product variants when there is request for variant products from customer
Q 5 - Long Term Planning is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled?
Answer : A
Explanation
Long term planning in SAP PP is used to check future demands at all Bill of Material level. You can check the current capacity and vendor ability to provide the material in required time period.
This is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled.
Q 6 - Using T-Code CO01, you can create a Production order without referring planned order?
Answer : A
Explanation
Q 7 - In which of MRP type, system consider all the material irrespective of changes and it is time consuming and not common in Production planning?
Answer : C
Explanation
NetChange
In this run system consider those material which has undergone some changes from the previous MRP run.
NetChange in planning horizon
This run considers the requirement in predefined planning horizon and not like net change which check the future requirements.
In this run, system consider only those material which has undergone some changes from their last MRP run.
Regenerative Planning
In this run, system consider all the material irrespective of changes and it is time consuming and not common in Production planning.
Q 8 - To check the available stock at any point of time, which of the following can be used?
Answer : B
Explanation
You can use Stock overview to check the available stock at any point of time. Stock overview can be checked using T-Code: MMBE or go to Logistics → Materials Management → Inventory Management → Environment → Stock → Stock Overview
Q 9 - Which of the following report is used to collect information about hierarchy of work center of a shift?
Answer : B
Q 10 - Long term planning is almost similar to Material requirement planning in simulate version to predict the production plan as per future requirements?